With few exceptions, any time of year is great for starting a landscape project. When it comes to design, if you want to have your yard installed and ready to use for summer, you’ll want to start the process as early as possible – preferably in the fall or early winter months. During our busiest time of year, it can take up to 6 months to start a design/build project (that does not include the time it takes to actually install your project). Additionally, if your project requires rototilling (sometimes required for new lawns or planting beds), we can not do this if the soil is wet, so this is another limitation. Lastly, although most plants are available year round, some plants are not available in the winter.